Industrial Waste Heat
Sanko Binary Power Plant
Location: Matsue City, Shimane Prefecture
Date of operation: March 2020
Rated Output: 280kW
Additional Information: Introduced the PC280 generator to Sanko’s Sanko binary power plant facility.
Geothermal
Naruko Hot Spring
Owner: Naruko Furusato Sosei Onsen Jigyo LLC.
Location: Osaki City, Miyagi Prefecture
Date of operation: August 2018
Rated Output: 75kW
Additional Information: Joint project with local hot spring owners
Beppu Hot Spring
Owner: Lifetech Beppu Onsen Hatsuden LLC.
Location: Beppu City, Oita Prefecture
Date of operation: June 2019
Rated Output: 840 kW
Additional Information: Joint project with local well owners
Hydro
Sukawa river small hydro power plant
Owner: Minakami Kamiiwabuchi Hydro Power LLC
Location: Minakami City, Tone District, Gunma Prefecture
Date of operation: June 2022
Rated Output: 195kW
Additional information: This power plant will utilize facilities from historic power stations in addition to utilizing an agricultural canal owned by the Kamiiwabuchi Water Users Association.
Solar
Solar Sharing
“Sustaina-Cacao” Solar Power Plant
Location: Nago City, Okinawa Prefecture
Date of operation: August 2020
Rated Output: 75kW
Mitsuishi
Location: Hokuto City, Hokkaido
Date of operation: March 2020
Rated Output: 2,552kW
Shikabe
Location: Shikabe Town, Kayabe District, Hokkaido
Date of operation: March 2020
Rated Output: 1,768kW